We are currently hiring for a Earned Value Management Specialist to join a reputable civil engineering contractor on a GBP170M heavy civils scheme in Hampshire. This complements their impressive portfolio of high spec sc
Position: Integrated Planning Manager Location: Stevenage, UK Company: Defence and Space Department: ISS Secure Connectivity (UK, US and Asia) About the Role: Defence and Space is seeking a highly skilled Integrated Plan
A major Global Engineering Consultancy needs experienced Project Managers to join a Client Management Team on a major design and construction packages on the Hinkley Point C project. The Project Managers should ideally h
Bristow Holland are seeking an experienced and dedicated Identity Access Management Specialist to join our dynamic IT team. This role involves developing processes and procedures to ensure our managed environments mainta
Bristow Holland are seeking an experienced and dedicated Identity Access Management Specialist to join our dynamic IT team. This role involves developing processes and procedures to ensure our managed environments mainta
Bristow Holland are seeking an experienced and dedicated Identity Access Management Specialist to join our dynamic IT team. This role involves developing processes and procedures to ensure our managed environments mainta
Position: Information Assurance and Data Governance Specialist (Manager level) Location: Office based, Bexhill-on-Sea Type: Full-time, 5 days, Temp-Perm (1 year FTC) Role Summary: As the Information Assurance and Data Go
The Senior Risk Management Specialist will be responsible for developing, maintaining, and supporting the company #39;s risk management file. You will be part of the development team of our imaging system, to find the be
Position: Project Manager Location: London Salary: GBP100k (Neg DOE), car/allowance, bonus (c.20%) and excellent benefits package The Project: Develop, construct and operate a new Energy from Waste (EfW) facility. The Ro
EVM Analyst- required for our client to join their specialist Civil Engineering contracting business. The company that the EVM Analyst will be working for are a well-established Civil Engineering contractor, whom work on
An exceptional opportunity has arisen for a Senior Planning Manager to join a leading name in the construction industry on a major project based in Suffolk. They will be an integral part of the team who have been appoint
Senior Planner - Data Centre Construction (UK) About the Role A leading infrastructure provider is seeking a highly motivated and experienced Planner to join their growing team. You #39;ll play a vital role in supporting
A Mechanical Project Manager is required for a family run contractor based in Central London. The Mechanical Contractor have been trading for 15+ years and has a turnover of GBP25m their main scope of works is healthcare
Senior Commercial Managers Are you a Commercial Manager with NEC3/4 Contract exp experience with a Rail, Infrastructure, heavy civils major project background and are ready to move to Senior Commercial Manager working on
About the Opportunity: Would you like to join one the UKs most technically competent fa ccedil;ade engineering and building contractors, who undertake projects from design through to handover? This company have a keen ey