Are you a Project Manager with demonstrated experience in leading and delivering complex manufacturing projects, preferably in the Aerospace industry (heat exchangers)? GMP Recruitment are proud to be in partnership with
Position: Programme Engineering Manager Location: Derby, UK Employment Type: Full-time We are seeking a dynamic and experienced Programme Engineering Manager to join a team. Reporting directly to the Managing Director, y
Company Description Assystem is an international company with one mission: accelerate the energy transition around the world. Every day, our 6,500 switchers located in 12 countries (Europe, Middle East, Pacific Asia Afri
Job Title: Senior Configuration Management Specialist Location: High Wycombe Salary: GBPDOE - We are booking interviews next week! Please call or email for a slot Key Qualifications: Configuration Management lifecycle, K
Security cleared Project Controls Manager required with MEWSIC experience. As a Senior Project Controls Manager with (Maritime Electronic Warfare Systems Integrated Capability) you will have an exciting and pivotal role
About the role This role will be based in Aberdeen / Peterhead. You will either be based in the North East or will be willing to relocate to the area / travel to site when required (2/3 times a week) Shape a career to be
We have an exciting new opportunity for a Sub Project Manager Role working on key Decommissioning Projects at Sellafield site on Legacy Ponds as part of The Decommissioning Alliance (TDA). About the Projects: Value Strea
We have an exciting new opportunity for a Planning Manager for the TDA to be based at Sellafield site in West Cumbria. This is for legacy pond work. Responsibilities of the TDA Planning Manager: Management of the Plannin
Our client has an opportunity for a Senior Engineering Project Manager to join them on an initial 12-month contract. As the Senior Engineering Project Manager, you will be delivering complex projects to time, cost and qu
Senior Project Manager/ GBP60-GBP65,000 + Car Allowance / Manchester We Build Recruitment are on the lookout for a Senior Project Manager based in the North West that preferably comes from an MEP background and is experi
Are you an expert in automotive cataloguing with an eye for precision? Do you want to develop your career in a company with a goal to achieve carbon-free combustion? Do you want to be rewarded for hard work in a company
Social Value Manager As part of our consistent improvement and development within Ireland, are delighted to be recruiting for a new position on our Irish team. The first of its kind in Ireland, the Social Value Manager w
Role: Product Information Management Specialist Location: Hybrid (Warwick) Duration: Permanent Roles and Responsibilities Add part numbers into the global PIM tool (CCU) as requested by Product Line. Research or validate
Job Advertisement: Senior Configuration Management Specialist Position: Senior Configuration Management Specialist Location: Job Description: As a Senior Configuration Management Specialist, you will play a pivotal role
THE ROLE Our client is actively seeking an accomplished professional to assume the pivotal position of Principal Flood Risk Management Specialist. This role demands a seasoned expert capable of providing strategic leader